• Propriety: Ajuntament d’Aldaia
  • Engineering: CMD Ingenieros
  • Location: Aldaia, España
  • Year: 2011
  • PEM: 116.000 €

The installation is based on a photovoltaic generator. This generation system consists of photovoltaic modules electrically connected together. The output current is connected to a power inverter that will provide the AC suitable for injection into the electricity grid. The protection needed for this type of installation, as well as supporting structures for photovoltaic modules is included.

FACILITIES ENGINEERING / Drafting and Construction Management of the PV system.

CIVIL ENGINEERING / Calculation metal support structure.

Related Work

RENOVATION OF IBIZA AIRPORT

Refurbishment of the

CEMENT INDUSTRY IN KIRENE

Construction project

MONASTERY HOLY SPIRIT OF GILET
Rehabilitation of the Hospice of the Holy Spirit Monastery o
SANT SADURNÍ D'ANOIA BRIDGE

Bridge construction o