• Propriety: Ajuntament de València
  • Engineering: CMD Ingenieros
  • Location: Valencia, España
  • Year: 2008
  • PEM: 4.900.000 €

8845 m2 underground parking garage with 366 spots on two floors. Construction near the ocean, with shallow phreatic level. Diaphragm walls anchored to the ground. Construction works with very detailed analysis due to flotation problems. Continuous reinforced concrete floors. Foundation made of concrete slab.

CIVIL ENGINEERING / Calculation of the structure and foundation.